Aggregate Logistics & Installation Job-Costing Model
Gravel Job Costing (60' Γ 14' Γ 4")
- Total Project Area = 60 ft Γ 14 ft = 840 sq ft.
- Stone Requirement = 17.3 tons at $38/ton = $657.
- Freight Delivery (2 truckloads over 15 miles) = $170.
- Turnkey contractor bid range: $1,808 β $3,236 in National Average.